1 2 3 4 5 6 7 8

 

9 10 11

 

Bob “Yogi” Elder (right) does a post-dive check of the equipment on Argo II after it was brought back on board the ship this afternoon. Rob Palomares, the Scripps CTD technician (left), removes the MAPR from the Argo II frame so that he can start downloading the data. Our next operation is dredging. In preparation for this, Ron Comer (on the A-frame) feeds the dredge wire through the smaller sheave. Randy Dickau is standing by to assist Ron in setting up the dredge.


« Previous | Next »

Bob “Yogi” Elder (right) does a post-dive check of the equipment on Argo II after it was brought back on board the ship this afternoon. Rob Palomares, the Scripps CTD technician (left), removes the MAPR from the Argo II frame so that he can start downloading the data. Our next operation is dredging. In preparation for this, Ron Comer (on the A-frame) feeds the dredge wire through the smaller sheave. Randy Dickau is standing by to assist Ron in setting up the dredge.

« Back to today's update