1 2 3 4 5 6 7 8

 

9 10 11 12 13 14 15 16

 

Chief Engineer Kevin Fisk watches from the A-frame control room as the Alvin was recovered in the late afternoon.


« Previous | Next »

Chief Engineer Kevin Fisk watches from the A-frame control room as the Alvin was recovered in the late afternoon.

« Back to today's update