1 2 3 4 5 6 7 8

 

9 10

 

At about 1215 hours today, we completed our last Argo II lowering of this expedition. As the Argo II was hauled in for the last time, PJ Bernard washed the fiber optic cable with fresh water so that the salty seawater would not corrode it.


« Previous | Next »

At about 1215 hours today, we completed our last Argo II lowering of this expedition. As the Argo II was hauled in for the last time, PJ Bernard washed the fiber optic cable with fresh water so that the salty seawater would not corrode it.

« Back to today's update