1 2 3 4 5 6 7 8

 

1 2 3 3

 

Alvin is pulled out of the hanger. The railroad tracks on the deck of the ship guide the dolly that the sub sits on so that Alvin is positioned directly below the A-frame for launching.


« Previous | Next »

Alvin is pulled out of the hanger. The railroad tracks on the deck of the ship guide the dolly that the sub sits on so that Alvin is positioned directly below the A-frame for launching.

« Back to today's update